Address |
Gwangmyeong-si, Gyeonggi-do, Republic of Korea |
Construction Year |
2017. |
Net Floor Area |
99,300㎡ |
Story |
14 Floors / 7 Floors |
Building Type |
Education & Medical Facility |
Structural System |
Reinforced Concrete + Steel |
|
|
In this project, Chung-Ang University hospital decided to start a medical complex cluster construction project in Gwangmyeong to provide high-quality medical services to people in medical blind spots in the treatment of severe disease. When planning the interior of the hospital, It was mainly focused on the specialized centers. In consideration of this, we applied importance factor as special, lateral force resistance system as a composite ordinary moment frame, and the foundation as a mat foundation. All of the process was followed according to the structural code. The steel member applied to this project was PH-steel (Pos-H), which has better cross-section performance and excellent quantity reduction than the existing rolled steel (Roll-H). To shorten the construction time, the top-down method (SPS) was applied. |