Hyundai Mipo Dockyard 6 Hyeonsa
Structural Diagnostics / 2021
LG Chemistry O Chang plant
Structural Diagnostics / 2019
SK Seosan Plant Production Plant 2
Pungsan Angang plant
Pungsan Ulsan plant
LG Chem Cheongju Plant Organic Material Development Center Structural Safety Diagnosis
Structural Diagnostics / 2023
Precise safety inspection in the second half of 2022 LG Chem Ochang Optical Building 3 (IT 3 Building)
Structural Diagnostics / 2022
Precise safety inspection in the second half of 2022 LG Chem Ochang Optical Building 1 (IT 1 Building)
LG Chem LG Electronics Co., Ltd. Building B-02 (Factory 1 Separator Factory) Precise safety inspection in 2022
Precision safety inspection service for main plant of Pungsan 301 production team
Accurate safety inspection of Pungsan Ulsan 2 plant in 2022
Accurate safety inspection of Pungsan Ulsan Plant 1 in 2022
Copyright ⓒ 2021 CLS Co.,Ltd. All rights reserved.