• Image One
  • Image One
  • Image One
Structural Diagnostics
Yeouido High School
Address 37, Gukjegeumyung-ro 7-gil, Yeongdeungpo-gu, Seoul
Construction Year 2020.
Net Floor Area 1,503㎡
Story 4 Floors
Building Type Education & Medical Facility
Structural System Reinforced concrete structure
  This task is an inspection following the regulations of the 『Special Act on the Safety Management of Facilities』 for Yeouido High School. The investigation thoroughly evaluates the condition and structural safety of the building by analyzing its physical and functional defects. In case of physical or functional defects or performance degradation, appropriate repair, reinforcement, and optimal management measures to prevent disasters and enhance the safe use of the facility are proposed.


*Education and Research Facility
GO BACK TO LIST