• Image One
  • Image One
Structural Design
Songdo Ki19BL Samsung Biologics Complex 2 Plant 5 Production Facility Construction
Address 430 Songdo-dong, Yeonsu-gu, Incheon
Construction Year 2023.
Net Floor Area 762,019 ㎡
Story 9 buildings
Building Type Factory & Plant
Structural System Reinforced Concrete Structure / Steel Structure
  This project has a total of 9 buildings, corresponding to the S4 soil condition, and the zone factor is equal to 0.176. In addition, 5m/sec was added to the basic wind speed of 28m/sec in Incheon, and analysis was performed considering the importance factor 1.
GO BACK TO LIST