Address |
672 Choji-dong, Danwon-gu, Ansan-si, Gyeonggi-do |
Construction Year |
2023. |
Net Floor Area |
1,091㎡ |
Story |
2F |
Building Type |
Factory & Plant |
Structural System |
Reinforced concrete structure |
|
|
This project has two floors above ground, corresponding to a soil condition of S4, and an area coefficient of 0.18. In addition, Ansan-si, Gyeonggi-do’s basic wind speed of 30m/sec was applied, and the analysis was performed considering the importance factor of 1. |